Nevada Union HS Site Improvements / Phase 2 Paving 

Contract Awarded:  Hansen Bros. Enterprises in the amount of $5,154,401
Project Scope:  New paving along Ali Avenue to Ridge Road and selected parking lots (overlays in some areas), pedestrian path of travel improvements (stairs, ramps, hand rails, treads), underground utility improvements, new site lighting, new student bus shelter, and new landscaping & irrigation. 
Engineer's Cost Estimate:  $5.72
 
Nevada Union HS Pool Building Modernization / ADA Enhancements / Boiler & Piping Replacement 
Contract Awarded:  McCuen Construction, Inc., in the amount of $2,150,000 
Project Size:  2,667 SF 
Engineer's Cost Estimate:  $1.7M

 

 Bear River High School Bard Units HVAC Replacement (Funded by Proposition 39--Not Measure B)

Contract Awarded: Aria Electric and Construction in the amount of $189,900  
Project Size: Replacement of 16 Wall-Mount Heatpump Units
Engineer's Cost EstimateNone

 

Bear River High School Bldg. "A" New Variable Refrigerant Flow HVAC 

Contract Awarded:  California Environmental Systems, Inc. in the amount of $1,452,190
Project Size: 18,847 SF
Engineer's Cost Estimate:  $1.2M

 

Bear River High School New Fully Automated Fire Alarm System

Contract Awarded: Gray Electric in the amount of $595,000
Project Size:131,140 SF
Engineer's Cost Estimate:  $916,287

 

 Nevada Union High School Site Improvements, Phase II, Increment 1 / Phase 1 Paving

Contract Awarded:  Hansen Bros. Enterprises in the amount of $2,557,699.72
Project Size:138,000 SF
Engineer's Cost Estimate:  $3.2M
 

Bear River High School New 8-Lane, All-Weather Track & Site Path of Travel Improvements

Site Work Contract Awarded: Lamon Construction, Inc. in the amount of $2,089,000
Track Surfacing Contract Awarded: CMAS Contract to Beynon Sports for Track Surfacing in the amount of $377,953.11
Project Size: Portions of Ramsey Field, Pathways and Parking Lot  
Engineer's Cost Estimate:  $1.43M (site work / track sub-grade & asphalt)

Silver Springs High School  Site Improvements - Paving & Path of Travel / New Courtyard

Contract Awarded:  Western Engineering Contractors, Inc. in the amount of $583,750
Project Size:  43,000 SF
Engineer's Cost Estimate:  $698,265
 