Location:  Bear River High School

Description:  New All-Weather Track, Site Drainage, Path of Travel & Accessibility Improvements         

 Contractor:  Lamon Construction (Site Preparation); Beynon Sports (Track & Field Event Surfacing)

Start Date:  March 27, 2018 Completion Date:  August 10, 2018 (NLT)

Worker Welding Gate Opening Mechanism

Worker Cutting Off Excess from Connectors

Steam Visible from Hot Asphalt

Team of Workers - Asphalt Paving of Track Subsurface

Workers Compacting Asphalt in East 'D' Zone

Workers Putting Finishing Touches on Asphalt before Compaction

Conveyor Scooping Up Asphalt and Transferring to the Hopper

Forms Placed for Concrete Sidewalk from ADA Parking and Path to Restroom

Worker Removing Concrete Splatter from Fence Posts and Other Workers Staging Additional Fencing Materials

Workers Pouring Concrete Around Track Outer Curb Fence Posts

Worker Ensuring Fence Post is Upright and the Correct Distance from the Sidewalk

Worker Using Post Hole Digger for Fence Posts

Worker Using Post Hole Digger for Fence Posts

Workers Installing Forms for Track Outer Concrete Curb

Project Inspector Reviewing Concrete Mix Documentation from Driver

Worker Connecting Drain Inlet Before Concrete Pouring

Workers Making Final Preparations to Sidewalk Forms in Front of visitors' Bleachers Before Concrete Truck Arrives

Forms Placed for Pouring Concrete Sidewalk Adjacent to Snack Shack

Workers Measuring Distance from Inner Track Curb

Workers Pouring and Finishing Concrete Sidewalk in Front of Home Bleachers

Motor Grader Operator Grading Asphalt Subsurface (Asphalt is Underneath Track Surface)

Dump Truck Operator Unloading Rock for Asphalt Subsurface

New Irrigation Layout for Existing Celebration Bermuda Turf

Worker Forming Curbs for Concrete Pouring in Long and Triple Jump Areas

Workers Pouring Concrete at Track Inner Curb

Workers Hammering Concrete Forms to Release Air to Aid in Concrete Settling

Workers Troweling Concrete Poured for Track Inner Curb

Close-up of Tractor Operator Releasing Rock for Backfill in Storm Drain Trench

Tractor Operator Backfilling Rock in Storm Drain Trench

Tractor Operator Using Leveling Attachment for Soil Under Future Track

Tractor Operator Using Sheeps' Foot Compactor Attachment to Compact Drainage Trench

Workers Rolling Out Geogrid Mesh for Soil Stabilization

Excavator and Compactor Operators Working Together to Compact Soil Over Geogrid Mesh

Bulldozer and Compactor Operator Working Together to Grade the Surface

Track Curbing Being Formed

Forms for Concrete Track Curb

Soil Scarification to Help in Removing Excess Moisture

Excavator Operator Digging Storm Drain Trench

Skidsteer Operator Removing Rocks in Area Being Graded

Bulldozer Operator Scarifying (~Tilling) Soil

Tractor Operator Backfilling Rock in Storm Drain Trench

Rocks Removed During Grading Operations

Operator Bulldozing Soil in Preparation for Compaction

Tracer Tape - Installed Over Drainage Pipe for Locating in the Future

Measuring Depth of Trench for Drainage Pipe Installation

Board of Trustees, Superintendent Johnson & Athletic Director Ganskie at 'Groundbreaking' Ceremony - April 11th, 2018

Principal Besler Stating What the Track Means to the School and Thanking Voters for Approving Measure B

Board of Trustees, Superintendent Johnson & Athletic Director Ganskie at 'Groundbreaking' Ceremony - April 11th, 2018

Skidsteer and Paddlewheel Scraper Operator Working Together to Remove Excess Soil

Tractor Operator Pulling a Float with Ripper for Minor Cutting and Leveling

Bulldozer Operator Giving Paddle Wheel Scraper a Push

Paddle Wheel Scraper Removing Soil and Turf

Bulldozer Operator Removing Turf in the "D Zone"

Bulldozer Operator Preparing Soil for Removal by Paddle Wheel Scraper

Tractor Operator Loading Concrete Chunks for Offsite Disposal

Workers Digging to Expose Irrigation Lines

Canine "Navigator"

Tractor Operator Leveling Soil

Concrete Borders Removed from "Old" Decomposed Granite Track

Tractor Operator Loading "Old" Track Cement Borders for Disposal

Worker Marking Underground Lines (USA)

Supervisor Reviewing Demolition Plans

View of "Old" Decomposed Granite Track

View of Stadium Entry