Contractors who use the District's website for obtaining bid documents take full responsibility for checking for addenda prior to the pre-bid conference/job walk and bid submission date. 

Bear River High School Bldg. "A" New Variable Refrigerant Flow HVAC 

Date and Time Bids are Due:  April 17, 2018 at 4 p.m. (Bid date unchanged as of 4/17/2018) 
Project Size: 18,847 SF
Engineer's Cost Estimate:  $1.2M
Project Scope:  Replace existing VAV Reheat System (‘Boxcar’ units) with new Variable Refrigerant Flow System.  Three outdoor VRF units will be installed with associated in-line supply and exhaust fans, ducted indoor units, and associated equipment controlled by a low-voltage communication network of unitary built-in controllers with on-board communications and a web-based operator interface.  Existing VAV boxes will be replaced with fancoil units while existing supply air distribution lines will be reused.  More than 2,600 feet of new refrigerant piping, in various sizes, will be installed.
Notice Inviting Bids:  View Here
Project Manual:  View Here
Construction Drawings:  View Here
Addendum 1 Documents and Drawings:  View Here

 

Nevada Union HS Pool Building Modernization / ADA Enhancements / Boiler & Piping Replacement 

Anticipated Availability of Bidding Documents:  ~ August/September 2018
Project Size:  2,667 SF
Project Scope:  Entire renovation and reconfiguration of the pool building checkin area, and men's & women's shower areas, restrooms and locker rooms.  Remove and replace existing boiler along with assoicated piping and flue, and remove and replace existing filtration system.   
Engineer's Cost Estimate:  $TBD

 

Bear River High School New Fully Automated Fire Alarm System

Contract Awarded: Gray Electric in the amount of $595,000
Project Size:131,140 SF
Engineer's Cost Estimate:  $916,287

 

 Nevada Union High School Site Improvements, Phase II, Increment 1 / Phase 1 Paving

Contract Awarded:  Hansen Bros. Enterprises in the amount of $2,557,699.72
Project Size:138,000 SF
Engineer's Cost Estimate:  $3.2M
 

Bear River High School New 8-Lane, All-Weather Track & Site Path of Travel Improvements

Contract Awarded: Lamon Construction, Inc. in the amount of $2,089,000
Delivery Method - CMAS Contract to Beynon Sports for Track Surfacing 
Project Size: Portions of Ramsey Field, Pathways and Parking Lot  
Engineer's Cost Estimate:  $1.43M (site work / track sub-grade & asphalt)

Silver Springs High School  Site Improvements - Paving & Path of Travel / New Courtyard

Contract Awarded:  Western Engineering Contractors, Inc. in the amount of $583,750
Project Size:  43,000 SF
Engineer's Cost Estimate:  $698,265
 
Links to drawings and specifications will be provided on this page when available.  
 
Thank you for your interest in working with the Nevada Joint Union High School District.