Contractors who use the District's website for obtaining bid documents take full responsibility for checking for addenda prior to the pre-bid conference/job walk and bid submission date. 

Nevada Union HS Pool Building Modernization / ADA Enhancements / Boiler & Piping Replacement 

Bid Date:  November 19, 2018 at 3:00 p.m.
Mandatory Pre-bid Conference / Job Walk:  October 26, 2018 at 10:00 a.m.
Project Size:  2,667 SF
Project Scope:  Entire renovation and reconfiguration of the pool building check-in area, and men's & women's shower areas, restrooms and locker rooms.  Remove and replace existing boiler along with associated piping and flue, and remove and replace existing filtration system.   
Engineer's Cost Estimate:  $1.7M

 

 Bear River High School Bard Units HVAC Replacement (Funded by Proposition 39--Not Measure B)

Date and Time Bids are Due: Bid was protested and will re-bid in the fall.  
Project Size: 12 Wall-Mount Heatpump Units With 2 Alternates
Engineer's Cost EstimateNone
Project Scope:  Replace 12 wall-mount HVAC units with 12 wall-mount Bard HVAC units

 

Bear River High School Bldg. "A" New Variable Refrigerant Flow HVAC 

Contract Awarded:  California Environmental Systems, Inc. in the amount of $1,452,190
Project Size: 18,847 SF
Engineer's Cost Estimate:  $1.2M

 

Bear River High School New Fully Automated Fire Alarm System

Contract Awarded: Gray Electric in the amount of $595,000
Project Size:131,140 SF
Engineer's Cost Estimate:  $916,287

 

 Nevada Union High School Site Improvements, Phase II, Increment 1 / Phase 1 Paving

Contract Awarded:  Hansen Bros. Enterprises in the amount of $2,557,699.72
Project Size:138,000 SF
Engineer's Cost Estimate:  $3.2M
 

Bear River High School New 8-Lane, All-Weather Track & Site Path of Travel Improvements

Site Work Contract Awarded: Lamon Construction, Inc. in the amount of $2,089,000
Track Surfacing Contract Awarded: CMAS Contract to Beynon Sports for Track Surfacing in the amount of $377,953.11
Project Size: Portions of Ramsey Field, Pathways and Parking Lot  
Engineer's Cost Estimate:  $1.43M (site work / track sub-grade & asphalt)

Silver Springs High School  Site Improvements - Paving & Path of Travel / New Courtyard

Contract Awarded:  Western Engineering Contractors, Inc. in the amount of $583,750
Project Size:  43,000 SF
Engineer's Cost Estimate:  $698,265
 
Links to drawings and specifications will be provided on this page when available.  
 
Thank you for your interest in working with the Nevada Joint Union High School District.