Location:  Nevada Union High School

Description: Site Work -- Underground Utilities, Accessibility, Path of Travel,        Student Drop-Off, Landscape Replacement & Paving

Contractor: Hansen Bros. Enterprises

Start Date:  March 26, 2018 Completion Date:  Sept/Oct 2018

Workers Undertaking Various Finishing Tasks for the new Concrete Driveway

Foreman Checking Slope with Level Before Workers Continue Finishing Concrete

DSA Inspector Reviewing Concrete Mix Design Information

Worker Wetting Concrete Forms While Another Worker Places Plastic to Protect the Seatwall

Workers Pouring Concrete for Edge of New Student Drop-off / Pick-up Driveway First

Workers Maneuvering Open Concrete Pipe into Place

Worker Removing Forms from Concrete Curbing at New Student Drop-off / Pick-up Area

Workers Operating Heavy Equipment for Soil Scarification (Tilling to Dry Out) and Compaction

DMCE Workers Taking a Break from the Heat

Forms Ready for Pouring of Driveway in New Student Drop-off / Pick-up Area

Workers Jackhammering and Removing Landing by Stairs Leading to NorthPoint Academy

Trenching for Electrical Conduit at Front of School

Caution: Buried Water Line Below - Warning Tape With Tracer Wire

Workers Moving New Waterline into Place

School Main Entry Stairs and Ramp Demolished and Removed

Construction Superintendent Discussing Soil Compaction with NV5 Tester / Inspector

Workers Connecting Water Pipe to Fire Hydrant

Project Team Reviewing Plans at Bi-weekly Construction Meeting

Parking Lot Light Fixture Demolished

Multiple New Utility Trenches Exposed

Workers Taking Lunch Break from Demolition of Lower Parking Lot

Workers Pouring Concrete at Curb in Lower Parking Lot

Workers Beating the Heat as the Sun Begins to Bear Down

Workers Operating Vibratory Compactor on Trench Backfill

Workers Assembling Water Line Valves While Surveyor Records Measurements

Worker Assembling New Water Line Valve

Tractor Operator Loading Concrete Debris Demolished from Front of School

Asphalt Grinder Operating Working in Lower Parking Lot

School Marquee Message - Main Entrance Closed

Mechanic Servicing Hydraulics on Heavy Equipment

Worker Operating a Tractor with a Breaker for Fracturing the Concrete

Worker Spraying Water to Reduce Construction Dust

Asphalt Grinder Operating at the Front of the Main School Entry

Hansen Bros. Enterprises Superintendent Reviewing Construction Plans

Worker Operating Excavator to Load Concrete Debris at Lower Parking Lot for Disposal

View from Behind an Asphalt Grinder

Workers Backfilling Conduit Trench With Sand

Worker Operating a Tractor to Dig at Utility Tie-in Area While Another Worker is Probing the Soil

Light Poles Down, Walkway Handrails Removed and Vehicle Stops Removed in Lower Parking Lot

Workers Sawcutting Concrete and Vacuuming Debris at School Entry

Trench for Conduit Piping at Front of West Gym

Temporary Campus Entry / Exit During Summer Break

Worker Removing Tree Stumps and Parking Stops in Lower Parking Lot

Temporary Turn Lane Striping on Ridge Road During Summer Break

Two Tractor Operators Working to Remove Tenacious Tree Stumps

Painting Directional Arrow for Temporary Campus Entry / Exit During Summer Break

Workers Removing Road Marking Templates + Equipment

Ali Avenue with Temporary 2-Way Striping

Beginning of Demolition in the Lower Parking Lot

Workers Smoothing the Concrete on the New Student Drop-off / Pick-up Area Seatwall

Worker Carrying a Hose from a Concrete Pumping Unit While Others Finish the Concrete

Seatwall Concrete Pouring Near Steps to the West Gym

Looking Down at Rebar in Forms for new Seatwall at Student Drop-off / Pick-up Area

Forms for New Seatwall at Student Drop-off / Pick-up Area

Worker Operating a Vibratory Roller Compactor

Workers Pouring Concrete Around the Granite Core Island

Worker Using a Long-Handled Float for Finishing Concrete at the ADA Parking Area in Front of the School

Open Concrete Pipe with Grate Connected to Storm Drain System

Pouring Concrete at ADA Parking Area Temporarily Halted - Heavier than Expected Amount of Rain

Hansen Bros. Enterprises Concrete Truck Drum with Logos of Non-profits Benefiting Children

Workers Finishing Concrete on Sidewalk Adjacent to ADA Parking Area

Workers Finishing Concrete on Sidewalk Adjacent to ADA Parking Area

Well Used Set of Construction Plans

Workers Using a Tractor to Pick-up and Move Equipment

Workers Placing Concrete Forms Around Water Cannon Island

Two Workers Operating a Vibratory Plate Compactor Over a Filled Trench

Various Discussions Ongoing at a Bi-weekly Project Team Meeting

Forms Placed for Seatwall Footings at Future Student Drop-off Area

Concrete Under West Gym Door Threshold Broke Out With Excavation

Underground Conduit Located in Future Student Drop-off Area

Worker Operating Excavator to Load Concrete Removed from Front of School

Workers Filling in Rock Around New Storm Drain Inlet

Two Workers Operating a Vibratory Plate Compactor

Worker Offloading Compactor with Drum Roller from Flatbed Trailer

Workers Pouring Concrete Around Storm Drain Inlet

Worker Signalling Truck Operator to Halt the Flow of Concrete

Workers Beginning to Level the Sidewalk Panel at the Side of Northpoint Academy

Workers Placing Trench Plate

Workers Pouring Concrete for Seatwall Footing at Future Student Drop-off Area

Truncated Dome Panel Placed in Concrete Sidewalk Edge

Worker Unloading Rock for Use on Site

Worker Operating Excavator to Remove Stubborn Tree Stump - Success!

Workers Installing Forms for Seatwall in Future Student Drop-off Area

Board of Trustees, Superintendent Johnson & Principal Rhoden at 'Groundbreaking' Ceremony - May 9th, 2018

Principal Rhoden Expressing Her Thanks to Taxpayers for this Measure B Project

Worker Directing Concrete Flow into Form

Workers Pouring and Finishing Concrete Sidewalk Along Ridge Road

Workers Excavating Soil

Worker Operating Asphalt Grinder

Worker Operating Asphalt Grinder

Workers Reviewing Construction Plans

Nevada Union High School Marquee

Two Tree Climbers with Nevada Union High School Miner in Foreground

Workers Removing Limbs from Work Area for Chipping

Tree Climber 'Dropping' Segment of Tree for Removal

Tractor Operator Removing Logs from Work Area

Tree Worker in Boom Truck Limbing Tree for Removal

Tractor Operator Moving Limbs to Chipper

Tree Climber Topping Tree for Removal

Worker Operating a Picker to Stack Logs

Hansen's Bros. Enterprises Foreman Reviewing Plans

Surveyor Surveying Job Site

Timber Falling Sign

Trees Cut Down

Road Construction Ahead

Asphalt and Concrete Cutting

Tractor Carrying Tree Round

Two Workers Around Tree Limbs

Civil Engineer Answering Questions from Prospective Bidders

Civil Engineer Providing Overview of the Project to Contractors Attending the Pre-bid Conference

Civil Engineer Providing Overview of the Project to Contractors Attending the Pre-bid Conference

Improvement Plans for Nevada Union High School Landscaping

Architect and Landscape Architect Reviewing Improvement Plans

Landscaping in Front of Nevada Union High School

Ugly Tree Stump and Tree in Front of Nevada Union High School

Landscaped Retaining Wall at School Entry

Nevada Union High School Stairs to Main Entrance

Nevada Union High School Parking Lot Cracking

District Director of Planning & Construction, Architect and Landscape Architect Discussing Project Improvements

Area at South Side of School to Receive New Landscaping

Architect, Landscape Architect and Civil Engineer Discussing Site Improvements

Nevada Union High School Miner Statue at Parking Lot Entry