Location: Nevada Union High School
Description: Site Work -- Underground Utilities, Accessibility, Path of Travel, Student Drop-Off, Landscape Replacement & Paving
Contractor: Hansen Bros. Enterprises
Start Date: March 26, 2018 Completion Date: Sept/Oct 2018
Workers Undertaking Various Finishing Tasks for the new Concrete Driveway
Foreman Checking Slope with Level Before Workers Continue Finishing Concrete
DSA Inspector Reviewing Concrete Mix Design Information
Worker Wetting Concrete Forms While Another Worker Places Plastic to Protect the Seatwall
Workers Pouring Concrete for Edge of New Student Drop-off / Pick-up Driveway First
Workers Maneuvering Open Concrete Pipe into Place
Worker Removing Forms from Concrete Curbing at New Student Drop-off / Pick-up Area
Workers Operating Heavy Equipment for Soil Scarification (Tilling to Dry Out) and Compaction
DMCE Workers Taking a Break from the Heat
Forms Ready for Pouring of Driveway in New Student Drop-off / Pick-up Area
Workers Jackhammering and Removing Landing by Stairs Leading to NorthPoint Academy
Trenching for Electrical Conduit at Front of School
Caution: Buried Water Line Below - Warning Tape With Tracer Wire
Workers Moving New Waterline into Place
School Main Entry Stairs and Ramp Demolished and Removed
Construction Superintendent Discussing Soil Compaction with NV5 Tester / Inspector
Workers Connecting Water Pipe to Fire Hydrant
Project Team Reviewing Plans at Bi-weekly Construction Meeting
Parking Lot Light Fixture Demolished
Multiple New Utility Trenches Exposed
Workers Taking Lunch Break from Demolition of Lower Parking Lot
Workers Pouring Concrete at Curb in Lower Parking Lot
Workers Beating the Heat as the Sun Begins to Bear Down
Workers Operating Vibratory Compactor on Trench Backfill
Workers Assembling Water Line Valves While Surveyor Records Measurements
Worker Assembling New Water Line Valve
Tractor Operator Loading Concrete Debris Demolished from Front of School
Asphalt Grinder Operating Working in Lower Parking Lot
School Marquee Message - Main Entrance Closed
Mechanic Servicing Hydraulics on Heavy Equipment
Worker Operating a Tractor with a Breaker for Fracturing the Concrete
Worker Spraying Water to Reduce Construction Dust
Asphalt Grinder Operating at the Front of the Main School Entry
Hansen Bros. Enterprises Superintendent Reviewing Construction Plans
Worker Operating Excavator to Load Concrete Debris at Lower Parking Lot for Disposal
View from Behind an Asphalt Grinder
Workers Backfilling Conduit Trench With Sand
Worker Operating a Tractor to Dig at Utility Tie-in Area While Another Worker is Probing the Soil
Light Poles Down, Walkway Handrails Removed and Vehicle Stops Removed in Lower Parking Lot
Workers Sawcutting Concrete and Vacuuming Debris at School Entry
Trench for Conduit Piping at Front of West Gym
Temporary Campus Entry / Exit During Summer Break
Worker Removing Tree Stumps and Parking Stops in Lower Parking Lot
Temporary Turn Lane Striping on Ridge Road During Summer Break
Two Tractor Operators Working to Remove Tenacious Tree Stumps
Painting Directional Arrow for Temporary Campus Entry / Exit During Summer Break
Workers Removing Road Marking Templates + Equipment
Ali Avenue with Temporary 2-Way Striping
Beginning of Demolition in the Lower Parking Lot
Workers Smoothing the Concrete on the New Student Drop-off / Pick-up Area Seatwall
Worker Carrying a Hose from a Concrete Pumping Unit While Others Finish the Concrete
Seatwall Concrete Pouring Near Steps to the West Gym
Looking Down at Rebar in Forms for new Seatwall at Student Drop-off / Pick-up Area
Forms for New Seatwall at Student Drop-off / Pick-up Area
Worker Operating a Vibratory Roller Compactor
Workers Pouring Concrete Around the Granite Core Island
Worker Using a Long-Handled Float for Finishing Concrete at the ADA Parking Area in Front of the School
Open Concrete Pipe with Grate Connected to Storm Drain System
Pouring Concrete at ADA Parking Area Temporarily Halted - Heavier than Expected Amount of Rain
Hansen Bros. Enterprises Concrete Truck Drum with Logos of Non-profits Benefiting Children
Workers Finishing Concrete on Sidewalk Adjacent to ADA Parking Area
Workers Finishing Concrete on Sidewalk Adjacent to ADA Parking Area
Well Used Set of Construction Plans
Workers Using a Tractor to Pick-up and Move Equipment
Workers Placing Concrete Forms Around Water Cannon Island
Two Workers Operating a Vibratory Plate Compactor Over a Filled Trench
Various Discussions Ongoing at a Bi-weekly Project Team Meeting
Forms Placed for Seatwall Footings at Future Student Drop-off Area
Concrete Under West Gym Door Threshold Broke Out With Excavation
Underground Conduit Located in Future Student Drop-off Area
Worker Operating Excavator to Load Concrete Removed from Front of School
Workers Filling in Rock Around New Storm Drain Inlet
Two Workers Operating a Vibratory Plate Compactor
Worker Offloading Compactor with Drum Roller from Flatbed Trailer
Workers Pouring Concrete Around Storm Drain Inlet
Worker Signalling Truck Operator to Halt the Flow of Concrete
Workers Beginning to Level the Sidewalk Panel at the Side of Northpoint Academy
Workers Placing Trench Plate
Workers Pouring Concrete for Seatwall Footing at Future Student Drop-off Area
Truncated Dome Panel Placed in Concrete Sidewalk Edge
Worker Unloading Rock for Use on Site
Worker Operating Excavator to Remove Stubborn Tree Stump - Success!
Workers Installing Forms for Seatwall in Future Student Drop-off Area
Board of Trustees, Superintendent Johnson & Principal Rhoden at 'Groundbreaking' Ceremony - May 9th, 2018
Principal Rhoden Expressing Her Thanks to Taxpayers for this Measure B Project
Worker Directing Concrete Flow into Form
Workers Pouring and Finishing Concrete Sidewalk Along Ridge Road
Workers Excavating Soil
Worker Operating Asphalt Grinder
Worker Operating Asphalt Grinder
Workers Reviewing Construction Plans
Nevada Union High School Marquee
Two Tree Climbers with Nevada Union High School Miner in Foreground
Workers Removing Limbs from Work Area for Chipping
Tree Climber 'Dropping' Segment of Tree for Removal
Tractor Operator Removing Logs from Work Area
Tree Worker in Boom Truck Limbing Tree for Removal
Tractor Operator Moving Limbs to Chipper
Tree Climber Topping Tree for Removal
Worker Operating a Picker to Stack Logs
Hansen's Bros. Enterprises Foreman Reviewing Plans
Surveyor Surveying Job Site
Timber Falling Sign
Trees Cut Down
Road Construction Ahead
Asphalt and Concrete Cutting
Tractor Carrying Tree Round
Two Workers Around Tree Limbs
Civil Engineer Answering Questions from Prospective Bidders
Civil Engineer Providing Overview of the Project to Contractors Attending the Pre-bid Conference
Civil Engineer Providing Overview of the Project to Contractors Attending the Pre-bid Conference
Improvement Plans for Nevada Union High School Landscaping
Architect and Landscape Architect Reviewing Improvement Plans
Landscaping in Front of Nevada Union High School
Ugly Tree Stump and Tree in Front of Nevada Union High School
Landscaped Retaining Wall at School Entry
Nevada Union High School Stairs to Main Entrance
Nevada Union High School Parking Lot Cracking
District Director of Planning & Construction, Architect and Landscape Architect Discussing Project Improvements
Area at South Side of School to Receive New Landscaping
Architect, Landscape Architect and Civil Engineer Discussing Site Improvements
Nevada Union High School Miner Statue at Parking Lot Entry
Non-Discrimination Policy Copyright © 2017 Nevada Joint Union High School District and its licensors. All rights reserved. Website Developed By CatapultK12™. | Log In