Location:  Bear River High School

Description:  New All-Weather Track, Site Drainage, Path of Travel & Accessibility Improvements                 

 Contractor:  Lamon Construction (Site Preparation); Beynon Sports (Track & Field Event Surfacing)

Start Date:  March 27, 2018 Completion Date:  August 10, 2018 (NLT)

Skidsteer and Paddlewheel Scraper Operator Working Together to Remove Excess Soil

Tractor Operator Pulling a Float with Ripper for Minor Cutting and Leveling

Bulldozer Operator Giving Paddle Wheel Scraper a Push

Paddle Wheel Scraper Removing Soil and Turf

Bulldozer Operator Removing Turf in the "D Zone"

Bulldozer Operator Preparing Soil for Removal by Paddle Wheel Scraper

Tractor Operator Loading Concrete Chunks for Offsite Disposal

Workers Digging to Expose Irrigation Lines

Canine "Navigator"

Tractor Operator Leveling Soil

Concrete Borders Removed from "Old" Decomposed Granite Track

Tractor Operator Loading "Old" Track Cement Borders for Disposal

Project Team Reviewing Construction Plans

Worker Marking Underground Lines (USA)

Supervisor Reviewing Demolition Plans

Civil Engineer and Architect Explaining Aspects of the Project to Prospective Bidders

Civil Engineer and Architect Explaining Aspects of the Project to Prospective Bidders

Worker Operating Tractor for Obtaining Soil Samples for Testing

View of "Old" Decomposed Granite Track

View of Stadium Entry

Site Walk with District Director of Planning and Construction, Civil Engineer and Architect

Bear River High School Track and Field Storage Container

Pedestrian Path of Travel into Stadium

Pedestrian Sidewalk into Stadium

Water Puddling on Field and Drainage Issues from Side of Track

Water Puddling on "Old" Decomposed Granite Track after Rainstorm