Location:  Bear River High School

Description:  New All-Weather Track, Site Drainage, Path of Travel & Accessibility Improvements         

 Contractor:  Lamon Construction (Site Preparation); Beynon Sports (Track & Field Event Surfacing)

Start Date:  March 27, 2018 Completion Date:  August 10, 2018 (NLT)

Forms for Pouring Concrete Curbing in 'D' Zone for Field Events

Close-up of Tractor Operator Releasing Rock for Backfill in Storm Drain Trench

Tractor Operator Backfilling Rock in Storm Drain Trench

Tractor Operator Using Leveling Attachment for Soil Under Future Track

Bulldozer Operator Grading Future Track Path

Tractor Operator Using Sheeps' Foot Compactor Attachment to Compact Drainage Trench

Workers Rolling Out Geogrid Mesh for Soil Stabilization

Excavator and Compactor Operators Working Together to Compact Soil Over Geogrid Mesh

Excavator Operator Covering Geogrid Mesh with Soil

Bulldozer and Compactor Operator Working Together to Grade the Surface

Water Truck Operator Watering Turf Field Cutoff from Irrigation

Track Curbing Being Formed

Forms for Concrete Track Curb

Soil Scarification to Help in Removing Excess Moisture

Excavator Operator Digging Storm Drain Trench

Skidsteer Operator Removing Rocks in Area Being Graded

Bulldozer Operator Scarifying (~Tilling) Soil

Tractor Operator Backfilling Rock in Storm Drain Trench

Rocks Removed During Grading Operations

Operator Bulldozing Soil in Preparation for Compaction

Tracer Tape - Installed Over Drainage Pipe for Locating in the Future

Measuring Depth of Trench for Drainage Pipe Installation

Discussion of Site Issues - NJUHSD, Siteline Architecture and Lamon Construction

Board of Trustees, Superintendent Johnson & Athletic Director Ganskie at 'Groundbreaking' Ceremony - April 11th, 2018

Principal Besler Stating What the Track Means to the School and Thanking Voters for Approving Measure B

Board of Trustees, Superintendent Johnson & Athletic Director Ganskie at 'Groundbreaking' Ceremony - April 11th, 2018

Skidsteer and Paddlewheel Scraper Operator Working Together to Remove Excess Soil

Tractor Operator Pulling a Float with Ripper for Minor Cutting and Leveling

Bulldozer Operator Giving Paddle Wheel Scraper a Push

Paddle Wheel Scraper Removing Soil and Turf

Bulldozer Operator Removing Turf in the "D Zone"

Bulldozer Operator Preparing Soil for Removal by Paddle Wheel Scraper

Tractor Operator Loading Concrete Chunks for Offsite Disposal

Workers Digging to Expose Irrigation Lines

Canine "Navigator"

Tractor Operator Leveling Soil

Concrete Borders Removed from "Old" Decomposed Granite Track

Tractor Operator Loading "Old" Track Cement Borders for Disposal

Project Team Reviewing Construction Plans

Worker Marking Underground Lines (USA)

Supervisor Reviewing Demolition Plans

Civil Engineer and Architect Explaining Aspects of the Project to Prospective Bidders

Civil Engineer and Architect Explaining Aspects of the Project to Prospective Bidders

Worker Operating Tractor for Obtaining Soil Samples for Testing

View of "Old" Decomposed Granite Track

View of Stadium Entry

Site Walk with District Director of Planning and Construction, Civil Engineer and Architect

Bear River High School Track and Field Storage Container

Pedestrian Path of Travel into Stadium

Pedestrian Sidewalk into Stadium

Water Puddling on Field and Drainage Issues from Side of Track

Water Puddling on "Old" Decomposed Granite Track after Rainstorm