Location: Bear River High School Ag Metal Shop
Description: Create Two Connections between the Ag Metal Shop Classroom and the Engineering Classroom / Add Fire Shutter Doors (Roll-up doors) at the Openings
Contractor: Treehenge Construction
Start Date: June 13, 2017 Completion Date: August 21, 2017
Non-Discrimination Policy Copyright © 2017 Nevada Joint Union High School District and its licensors. All rights reserved. Website Developed By CatapultK12™. | Log In